Trane GAF2A0A36S31EE Installer's Manual page 20

60 hz convertible air handlers 1-1/2 - 3 ton. black epoxy coil, standard coil.
Table of Contents

Advertisement

Important: Heat Sensitive Bulb.
The temperature Bulb must be removed or a wet rag
must be wrapped around the suction line between
the Bulb and the braze joint to protect the Bulb from
failure due to overheating.
STEP 8 - Braze refrigerant line connections.
Note: The suction line must be insulated prior to
brazing the line set to the air handler stubs.
1. Pull back the insulation before brazing the suc-
tion line.
2. Wrap the TXV sensing bulb and line section
between the bulb and braze with a wet rag.
3. Braze the refrigerant line connections.
Important: Care must be taken during brazing to
avoid damage to unit components and wiring.
STEP 9 - Pressurize the refrigerant lines and evapo-
rator coil to 150 PSIG using dry nitrogen.
STEP 10 - Check for leaks by using a soapy solution
or bubbles at each brazed location.
STEP 11 - Place the TXV sensing bulb back into the
clip on the Vapor Line. Insulation over the TXV bulb
is not required.