Connecting Your 5075 To The End Of A Loop - IBM 5075 Setting Up

For as/400e server
Hide thumbs Also See for 5075:
Table of Contents

Advertisement

__ 7. Connect the HSL cable that you installed to connector 1 on your 5075 to
__ 8. Connect SPCN cable that you installed to connector J16 on your 5075 to
__ 9. Install the covers on all of your expansion units and your system unit.
__ 10. Go to "Chapter 4. Completing your installation" on page 15.

Connecting your 5075 to the end of a loop

Use this procedure to install your 5075 in the last position in a loop of expansion
units. In this procedure you will install your 5075 between your system unit and
the expansion unit which is currently in the last position. Refer to the expansion
unit which is currently in the last position as unit Y as is shown in Figure 11 and
Figure 12.
Figure 11. HSL connections
Figure 12. SPCN connections
__ 1. Remove the back covers from your other expansion units, 5075, and system
__ 2. Connect the cables to the 5075. Go to "Appendix B. Connector Locations" on
12
Setting Up Your 5075 Expansion Unit V4R5
connector 0 on unit Y.
connector J15 on your unit Y.
unit. Go to "Appendix A. Removing the covers" on page 19 if you need
instructions.
page 23 for connector locations.
__ a. Connect a new HSL cable to the HSL connector 0.
__ b. Connect a new SPCN cable to connector J15
__ c. Connect the power cable. Do not plug into the electrical outlet.

Advertisement

Table of Contents
loading

Table of Contents