Curb Layout Drawing / 050-061 Models; Fig. 2-5 - General Arrangement Drawing - York ECO2 YPAL 050 Installation & Operation Manual

Design level f simplicity elite control
Hide thumbs Also See for ECO2 YPAL 050:
Table of Contents

Advertisement

Installation

CURB LAYOUT DRAWING / 050-061 MODELS

71.83
NOTES:
1. Unit must be installed square and level.
2. Curb confi guration for "bottom" return and "bottom" supply.
3, These drawings are not intended as construction documents for the fi eld fabricated roof curbs. Johnson Controls will not be responsible for
the unit fi t up, leak integrity, or sound level for installation using fi eld fabricated roof curbs.
4. The YPAL unit does not have a base pan under the condensing section of the unit. Field fabricated roof curbs must have a cap on the top of
the condensing section of the curb to prevent moisture from entering the space. The cap design must be sloped away from the supply duct
opening to the end of the unit for the drainage of the moisture off of the top of the cap.
FIG. 2-5 – GENERAL ARRANGEMENT DRAWING
28
333.69
41.19
66.08
FORM 100.50-NOM6 (1207)
35.10
21.00
66.19
229.56
84.50
1.75
TYP
14.00
LD08297
JOHNSON CONTROLS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents