Heatilator NDV30-IFT Installation Manual page 26

Table of Contents

Advertisement

Top Vent - Vertical Termination
Two Elbows
Maximum horizontal run
H
)
(
TOTAL
is 100% of vertical, but cannot
exceed 26 ft. (7.92 m)
V
2
V
+ V
1
2
6 ft (1.83 m) min.
60 ft (18.29 m) max.
Figure 4.16
Install Top Vent Flue Visor - No Elbow Configurations
Remove screws holding flue visor to firebox top. See
Figure 4.17.
Remove the flue visor.
Using the screws removed and the same holes, install
the top vent flue baffle and flue visor.
-
The top vent flue baffle will be turned to install below
the level of the firebox top for 12-30 ft. vertical runs of
vent. See Figure 4.18.
-
The top vent flue baffle will be turned to install inside
for 31-60 ft. vertical runs of vent. See Figure 4.19.
Heatilator • NDV30-IFT, NDV33-IFT, NDV36-IFT, NDV36-IFT-NVR, NDV42-IFT Installation Manual • 2620-980 Rev. C • 8/20
26
V
H
1
1
Figure 4.17 Remove Flue Visor
Figure 4.18 12- 30 Ft. Vertical Run
Figure 4.19 31-60 Ft. Vertical Run

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents