7 Installation and Commissioning
7.1 Installing the hardware
Installation and Commissioning
7
In this chapter, the necessary steps are described for commissioning the example
project with the hardware and software used (from chapter 2.2.2).
7.1
Installing the hardware
The figure below shows the hardware setup of the application.
Figure 7-1
S7-1500
P1R P2R
L+ M
X1
24 V DC
SIPLUS HCS4200
X1
X3.+
24 V DC
X3.-
X3
CIM4210
POM4220
PROFINET
HIGHEND
V2.2
HCS4x00Library
Entry ID: 109478117,
V2.2.1,
IP address: 192.168.0.1
Subnet: 255.255.255.0
IP address: 192.168.0.242
Subnet: 255.255.255.0
PROFINET IE
IP address: 192.168.0.2
Subnet: 255.255.255.0
L1
N
L2
X1.1
X1.2
X1.3
X1.4
X3.1
X3.2
X3.3
X3.4
09/2018
(TIA Portal)
Parallel connection of 2
heating elements at channel 1
Radiant heater panels
PC/PG
STEP 7
N
62