Installation and Commissioning.
4
Installation
and
Commissioning
This section provides information about the installation
and
commissioning
with
regard
to
the
following:
-
Required
documents
-
Personnel requirements
-
Tools,
devices and expendable materials to be
used
-
Accident prevention
- Recording/Documentation.
4.1
Safety instructions for installation
High voltage
~
Danger to lifel
This work may
only
be done
by
appropriately qualified and instructed
personnel.
.
Units should not remain
open
for
any
longer than is absolutely necessary,
which must be performed with the utmost
care.
Avoid coming into contact
with live components.
,
. .
~
WARNING
......
Danger from tipping or falling loads - Danger to lifel
Do not stand under lifted
loads.
Do no! exceed the carrying capacity of transport equipment and lifting
gear.
Details of masses and weights ar.e provided in the Technical Data (see
Chapter '7 Technical
Data").
-Local safety rules must be observed.
4.2
Mechanical Installation
The following documents need to be provided
for installation:
-
These operating
Instructions
-
Installation and commissioning
report.
A responsible person
(or
supervisor) must be
assigned
to oversee
the
Installation
and commissioning work, who instructs personnel during installation and
commissioning ta.sks and checks for compliance with the applicable safety
measures. Furthermore this person
Is
responsible for organization,
monitoring and
signing off the
work.
The installatIon and commissioning work must be
performed
by authorized
personnel with Bufflcient qualifications and experience.
Suitable Ilfting
gf!lar
In perfect working condition limd transport
vehiole~
with
Illufficient
load~b~arin9
cflpl:lclty must bill used for
In~te!
ll
ll1tion
.
The
flccld~nt
prevention regulations must
b~
observed.
Installation and commissioning must be documented In the report
provld§ld.
9229 0040 176
O
F
2017~12~18
The 3·phas6 design 27 switch-unit must be installed so that
the
.
Recloser Ie fixed
on
the
outer
fixture seatings of the housing and
not on the parking feet during operation (see Fig.
2).
43