Step Five: Check and test the installation of the pump

Serious injury could result from leaks if pump is improperly assembled, installed or the
design of the pump is modified.
Follow the steps below to ensure the pump is properly installed. Never modify the pump
design.
1. Check
installation
2. Test with
potable water
Installation (continued)
Check installation to ensure the pump is properly mounted, wired, plumbed and
in safe working condition.
Test the system for leaks with potable water:
a) Fill the tank with potable water.
b) The pump is an "on demand" pump. When turned on, the pump will
prime itself, then turn off once reaching pressure. When the demand for
flow continues, the pump will automatically re-start.
c) Check for leaks throughout the system. If a leak is detected, fix the leak
and re-test the system with potable water.