Epson M200 Series Service Manual page 58

Color
Hide thumbs Also See for M200 Series:
Table of Contents

Advertisement

M200 / M205 / M100 / M105 Series
PF Encoder Sensor
Left side of printer
PF Encoder Sensor
Rib
PF Encoder FFC
Ribs
CN7
Double Side Tape
Route the PF Encoder through ribs of the Main Frame and connect the
connector (CN7) of the Main Board. Then secure with the double-sided tape
(x2) on the position shown in above.
PS Unit
Frame Base
PS Unit cable
Bottom of Frame Base
Ferrite core
PS Unit cable
Pull out the PS Unit cable from the hole of the Frame Base first, and then
route it through the rib of the Frame Base.
Put the ferrite core into the position shown in the figure above.
Disassembly/Reassembly
Head FFC (Routing on the CR Unit)
Left side of CR Unit
Head FFC
Connector of CR Encoder
Rib A
Rib B
Connector of Printhead
Route the CR Encoder FFC along the Rib A and connect it to the
connector of the CR Encoder.
Route the Head FFC through the rib A and B, and then connect it to the
connector of the Printhead.
PF Motor
Frame Base
PF Motor cable
Bottom of Frame Base
Rib
Hole
PF Motor
Route the PF Motor cable as follows.
1. Pull out the PF Motor cable from the hole of the Frame Base.
2. Install the PF Motor, and secure the PF Motor cable (black) with the rib of
the Frame Base, and then route it through the rib of the Frame Base.
Aligning Head FFC with CR Encoder FFC
CR Unit
Head FFC
CR Encoder FFC
Double-sided tape
Head FFC/CR Encoder FFC
Align the Head FFC and CR Encoder FFC, and then route them through the FFC Holder as shown in the figure above.
CR Motor cable (red)
Rib
Hole
Route PF Motor
cable through rib.
CR Motor cable (black)
Route the CR Motor cable as follows before installing the Shield Plate.
Secure PF Motor
1. Route the CR Motor cable (black) around the rib A of the Frame Base (two turns).
cable (black) with rib.
2. Route the CR Motor cable (red) through the rib B of the Frame Base, and then route it through the rib A taking care not to let the CR Motor cable (red)
come over the CR Motor cable (black).
3. Twist the CR Motor cable (black) and CR Motor cable (red) twice, and then route them through the hook C of the Main Frame.
4. Route the CR Motor cable (black) and CR Motor cable (red) in the order of hook D of the Main Frame, groove of the FFC Holder, and hook E of the Main
Frame.
Routing FFCs/cables
Head FFC (Routing on the Main Frame)
Fold here inside FFC Holder
Rear
Main Frame
Stack the Head FFC over the CR Encoder
FFC to keep the Head FFC on top.
FFC Holder
CR Motor
CR Motor cable
Hook D
Groove of FFC Holder
Hook C
CR Motor
Rib A
Rib B
Revision A
FFC Holder
Head FFC/CR Encoder FFC