Download Print this page

Graco 16R955 Installation, Operation & Parts page 8

Complete pressurized bead system for linelazer 200hs/dc/mma and linelazer 250sps
Hide thumbs Also See for 16R955:

Advertisement

200HC/DC/MMA Pressurized Bead System Kit 25R268
Complete Frame Assembly
NOTE: If desired, rotate recoil 90° counter-clockwise.
1. Use 9/16 wrench to tighten bottom screws (MM) to
hardware shown.
ti21200a
8
2. Install plastic end caps (ZZ) into frame. Use rubber
ti21500a
MM
mallet to pound end caps into place.
ZZ
ti20884a
332230N

Advertisement

loading

This manual is also suitable for:

16r96216r96016r961