Download Print this page

Graco 16R955 Installation, Operation & Parts page 12

Complete pressurized bead system for linelazer 200hs/dc/mma and linelazer 250sps
Hide thumbs Also See for 16R955:

Advertisement

LL200 Compressor Installation
18. Slowly pull the starter rope to rotate shaft. With the
keyway of the shaft coupler (5) facing up, place the
shaft key (2) into the keyway. A light tap with a
rubber mallet may be needed to ensure the key
seats completely.
Performing steps 19 through 23 out of order, or
incorrectly, may cause excessive side loading on the
compressor crankshaft and could cause a premature
failure of the compressor.
12
NOTICE
19. Slide compressor (1) onto the shaft coupler (5) until
the face of the compressor is flush with compressor
bracket (4). Rotate the compressor 90 degrees
counter-clockwise until the set screw is accessible.
332230N

Advertisement

loading

This manual is also suitable for:

16r96216r96016r961