Download Print this page

Graco 16R955 Installation, Operation & Parts page 16

Complete pressurized bead system for linelazer 200hs/dc/mma and linelazer 250sps
Hide thumbs Also See for 16R955:

Advertisement

LL200 Compressor Installation
Bead Tank Mounting
1. Place bead tank on supporting base with outlet
fittings facing compressor.
NOTE: Position handle to best suit filling needs.
Loosen bolt (aa) to help swivel, then retighten.
2. Place clamping band around tank and secure with
mounting hardware shown below. Tighten until
there is no movement between clamp and bead
tank.
NOTE: The flats on the clamp are not intended to
touch the hopper bracket when tightened.
16
aa
ti20704a
ti21193a
3. Install 36 in. nylon air line (dd) from top of regulator
to swivel fitting on top of bead hopper. Cut air line to
desired length. Push air line into fitting until end
touches bottom of fitting.
dd
ti21195a
332230N

Advertisement

loading

This manual is also suitable for:

16r96216r96016r961