Husqvarna R 422 Ts Workshop Manual page 18

Hide thumbs Also See for R 422 Ts:
Table of Contents

Advertisement

DELIVERY AND DEALER SERVICE
Packaging and Unpacking
The machine is normally packed using
special packaging when delivered from the
factory. This packaging is comprised of a
wood base with a strong cardboard top
section, all held together with plastic
wrapping.
!
WARNING!
Handle the transport box carefully.
Keep the goods as flat as possible.
Use long forks to lift from the short
side.
The base is fitted with pallet feet and the
goods can be handled with a normal forklift
truck from the long side. In order to keep the
goods as flat as possible, two people ought
to help the truck driver. Lift and then drive the
truck carefully.
Break the plastic wrapping and remove the
cardboard packaging.
The machine then stands on the base with
the brakes on and is secured with wooden
blocks.
Check that the machine has not been
damaged during transport when the
packaging is opened. Any damage should be
reported to the transport company as per
routine.
The packaging shall not be returned.
Lifts from the short side, see illustration,
require long pallet forks.
Packed Components:
Number Component
1 pc
Steering wheel with steering rod
1 pc
Allen screw for steering rod
1 pc
Lock nut for steering rod
1 pc
Operator's Manual
1 pc
Owner's Manual, Briggs & Stratton
4 pcs
Wheels (certain markets)
16
English-
Long pallet forks are required

Advertisement

Table of Contents
loading

This manual is also suitable for:

R 422 ts awd

Table of Contents