Boarding Step; Steering Column Installation - BRP SEA-DOO GTX LTD iS 255 Predelivery Bulletin

Table of Contents

Advertisement

PARTS TO BE INSTALLED
ssi2009-002-005_a
1. BLACK (-) cable
2. RED (+) cable
13. Cover positive battery post with rubber boot.
Do not install the storage bin yet. It's removal is
necessary to connect B.U.D.S..
WARNING
Ensure vent tube is not kinked or obstructed.
Battery vent tube must be properly installed
and secured with a locking tie.

Boarding Step

1. Position boarding step on fixation holes.
sbl2009-004-014_a
1. Boarding step fixation holes
2. Install M6 washers (previously removed from
retaining brackets).
3. Install M6 x 25 screws (from predelivery kit).
4. Torque M6 screws to 10 N•m (89 lbf•in).
For an easier installation, place small shafts
NOTE:
into the housing cavities to lock the boarding step
downwards.
8 / 23
sbl2009-004-015_a
1. Small shaft

Steering Column Installation

International Models
1. Cut retaining strap that holds front storage
cover to vehicle.
NOTICE
– Properly hold the front storage cover with
hand while cutting the retaining strap.
– Be careful not to damage vehicle compo-
nents while cutting.
sbl2009-004-102_a
1. Front storage cover
2. Retaining strap
2. Cut locking tie securing front storage cover to
vehicle.
3. Carefully remove the cover from vehicle.
2009-3
PREDELIVERY

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sea-doo rxt is 255189a189b349a349b

Table of Contents