Husqvarna P 520D Workshop Manual page 31

Hide thumbs Also See for P 520D:
Table of Contents

Advertisement

Propulsion
Dismantling
1.
Dismantle the engine hood.
2.
To make room to remove the engine, either the
radiator or the drive shaft for the hydraulic pump
must be removed.
3.
Remove the air filter. See Air Filter, Removing
and Fitting.
1
1.
Exhaust system
retaining screw
30
– English
2
2.
Engine retaining screw
4.
Remove the exhaust system by loosening
the fastening screws (1), (2).
5.
Remove the battery. See Replacing the Battery.
6.
Loosen the hose clip (3) on the battery box.
7.
Dismantle the holder for the supply fuse (1).
8.
Loosen the fastener for the electric cable (2)
on the back of the battery box.
9.
Dismantle the battery box fastenings (4) and
remove the battery box.
10. Dismantle the prefilter (5) and plug the hoses (6).
11. Loosen the return hose from the fuel injector and
plug or clamp it shut so fuel does not leak out.
12. Dismantle the fuel hose (6) between the prefilter
and the fuel pump.
13. Dismantle the fuel hose (6) between the prefilter
and the fuel pump.
2
1
1.
Supply fuse
2.
Electric cable
3.
Hose holder
3
4
5
6
4.
Battery box fastening
5.
Prefilter
6.
Fuel pump hose

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 525d

Table of Contents