Fasten the drill stand with anchor or quick-
clamping column. Then fold in the drill-hole cen-
tre indicator 10.
Fastening with Anchor (see figure C)
For fastening of the drill stand to brickwork or
concrete with anchor (accessory), drill a sepa-
rate anchor hole.
Clearance from anchor hole–centre of the in-
tended bore hole
optimal
GDB 2500 WE
330 mm
GDB 1600 WE/DE
270 mm
For offset bore drilling, increase the distance
between the anchor hole and the centre of the
intended bore hole by the value m (see "Posi-
tioning the Drill Stand before Fastening").
The following dimensions apply for the anchor
hole:
Diameter
Brickwork
20 mm
Concrete
15 mm
Insert a concrete hammer-drive anchor or a
brickwork anchor 23. Screw the quick-clamping
spindle 24 into the anchor.
Position the drill stand, attach a washer, and
then screw together with the wing nut 25. After
levelling (see "Levelling"), tighten the wing nut
using an open-end spanner, size 27 mm.
Fastening with a Quick-clamping Column
(see figure D and E)
With use of a Bosch quick-clamping column (ac-
cessory), the drill stand can be fastened be-
tween ceiling and floor or between two walls.
The clamping range is between 1.7 m and 3 m.
Position one end of the quick-clamping column
onto the base plate of the drill stand. The
mounting surface for the other end of the quick-
clamping column against the wall must have suf-
ficient stability and be secure against slipping.
For fastening the quick-clamping column, read
and observe its operating instructions.
Bosch Power Tools
Levelling
Screw the levelling screws 11 in or out individu-
ally, until the spirit level 4 (for vertical assembly)
or the spirit level 5 (for horizontal assembly) is
precisely aligned.
Now, firmly fasten the drill stand with anchor at-
tachment or with the quick-clamping column.
Operation
possible
After each adjustment on the drill stand,
310–380 mm
firmly retighten all screws and locking han-
dles and allow the locks to engage again.
250–320 mm
Drilling-angle Adjustment (see figure F)
Loosen the upper 21 and the lower locking han-
dle 22 for drill-angle adjustment.
Pull the lock button for drill-angle adjustment
20. Adjust the drill stand to one of the four pos-
sible drilling angles (0°, 15°, 30° or 45°) and al-
Depth
low the lock button to engage into the corre-
sponding hole in the drilling column.
85 mm
Tighten both locking handles 21 and 22 again.
50 mm
The drill stand may not be used until both
locking handles of the angle adjustment
have been tightened again.
Mounting the Diamond Drill
(see figure G)
Loosen the locking handles 6 and 7 on the drill
stand. Pay attention that the feed handle 17 is
blocked by the feed lock 3 (see "Feed Handle").
Insert the power tool from above into the drill
fixture 8 down to the stop. Retighten the locking
handles 6 and 7 again. When mounting the
GDB 1600 WE/DE, the upper locking handle 6 is
not required.
Place the water hose and the mains cable of the
power tool into the holders of the drill fixture on
the drill stand.
Proceed in reverse order when removing the
power tool from the drill stand.