Piping - Slant/Fin EUTECTIC EC-10DV Series Installation And Operating Instructions Manual

Direct vent oil-fired water boiler/no. 2 oil
Hide thumbs Also See for EUTECTIC EC-10DV Series:
Table of Contents

Advertisement

4
Figure 2. Typical Installation
Sufficient space shall be left clear around the boiler.
Do not stack items on or box in the appliance within
the required clearances to combustibles.
EC-10DV
7/8
33
Boiler
A (in)
1 /4
EC-13DV
22
1 /4
EC-14DV
27
1 /4
EC-15DV
32
1 /4
EC-16DV
37
The figures stated in inches in the drawings below are
the minimum recommended dimensions for providing
easy access around the boiler.

PIPING

IMPORTANT: Boilers are to be used with closed system. Any application that
uses water from system, causes the introduction of a frequent supply of fresh
water into the boiler. This will cause damage to the boiler. Use of heat
exchangers will prevent this damage.
PIPING FOR WATER UNITS
NOTE: On knock down boiler only, jacket may be installed after return piping
connection, but must be installed prior to adding trim & supply piping.
I. CIRCULATING SYSTEM
A.
FORCED CIRCULATION hot water heating system: Use the top
tapping as supply tapping, and use the rear bottom tappings for
the return.
B.
A FLOW CONTROL VALVE will prevent gravity circulation.
II. AIR CONTROL SYSTEMS
A.
DIAPHRAGM-TYPE COMPRESSION TANKS are used to control
system pressure in an AIR ELIMINATING SYSTEM: an automatic
air vent is used to REMOVE air from the system water. See figure 3.
EUTECTIC EC-10 DV

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents