Tools required: • 1 Phillips screwdriver • 1 Wide flat screwdriver • 1 13mm open end wrench • 1 17mm open end wrench • 1 19mm open end wrench Step 1– Mounting Feet Boiler body assembly 1. Fit the adjustable feet to the height converter (The feet are delivered with the screw bag in the jacket and insulation package) EUTECTIC EC-20 SSEMBLY GUIDE...
Page 4
Step 2 Step 2 Mounting: Hinged door Boiler casting assembly is normally shipped with boiler door hinges on the right when viewing boiler from front. If boiler casting assembly has door removed, it can be mounted with hinges on the right side when viewing from the front by following the procedure below..
Page 5
Step 3 Step 3 Adjusting the boiler door To adjust the boiler door, adjust the top hinge: Untighten screw A turn the screw B to position the door, Tighten screw A. EUTECTIC EC-20 SSEMBLY GUIDE...
Page 6
Step 4 Baffles Put the baffles in place. Align the convection accelerators with the first fins. Put the baffles in place. Align the convection accelerators with the first fins. EC-25 EC-26 EC-25 EC-27 EC-26 EC-28 EC-27 EC-28 Step 5 Close the boiler door and tighten using the 2 special nuts.
Page 7
Step 6 Mounting: Front crosspiece with Basic or Thermatic Control Thermatic Basic EUTECTIC EC-20 SSEMBLY GUIDE...
Page 8
Step 7 Fitting the body insulation EUTECTIC EC-20 SSEMBLY GUIDE...
Step 8 Assembling the burner Fix the gasket with the flange on the burner door using four 3/8”–16 studs, supplied. (screw shorter length of metric thread into burner door.) Push the burner into the burner door until it will not go any further. Fix the burner using hex nuts, supplied.
Page 10
Step 9 Danger Label Rating Label Baffle Label Attach Burner Instructions Label that is packed with Burner EUTECTIC EC-20 SSEMBLY GUIDE...
Step 10 Step 11 Fitting the rear panel Remove the clean out trap Remove the cleanout. EUTECTIC EC-20 SSEMBLY GUIDE the cleanout.
Page 12
Step 12 Fitting the rear panel - continued Fit the rear panel EUTECTIC EC-20 SSEMBLY GUIDE...
Page 13
Step 13 Replace the clean out trap Replace the clean out trap EUTECTIC EC-20 SSEMBLY GUIDE...
Page 14
Step 14 Control panel assembly – Installing sensor bulbs Then, insert the bulbs inside the pocket and maintain them with the spring - Detail B: Thermatic Control Panel Detail A: Basic Control Panels - Boiler thermostat - Boiler sensor - Boiler sensor - Safety thermostat - Safety thermostat - Thermometer...
Page 15
Step 15 Fitting the front panel - Fitting the top panel Connect burner hanress to molex connector. Make sure it disconnects when opening door. See page 9 for adjustment if necessary. EUTECTIC EC-20 SSEMBLY GUIDE...