Cisco CSA 90 Series Installation And Maintenance Manual page 23

Content security appliances
Table of Contents

Advertisement

Chapter 1
Install Cisco x90 Series Content Security Appliances
Figure 1-3
1
Front mounting pegs
2
Rack post
Install the slide rails into the rack:
Step 3
Align one slide-rail assembly front end with the front rack-post holes that you want to use.
a.
The slide rail front-end wraps around the outside of the rack post and the mounting pegs enter the
rack-post holes from the outside-front (see
Note
Push the mounting pegs into the rack-post holes from the front of the outside.
b.
Press the securing plate release button, marked "PUSH." The spring-loaded securing plate closes to
c.
lock the pegs in place.
Adjust the slide-rail length, and then push the rear mounting pegs into the corresponding rear
d.
rack-post holes. The slide rail must be level front-to-rear.
The rear mounting pegs enter the rear rack-post holes from the inside of the rack post.
Attach the second slide-rail assembly to the opposite side of the rack. Ensure that the two slide-rail
e.
assemblies are at the same height with each other and are level front-to-back.
Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
f.
and lock in place.
Insert the appliance into the slide rails:
Step 4
The appliance can weigh up to 67 pounds (59 kilograms) when fully loaded with components. We
Caution
recommend that you use a minimum of two people or a mechanical lift when lifting the appliance.
Attempting this procedure alone could result in personal injury or equipment damage.
a.
Align the rear of the inner rails that are attached to the appliance sides with the front ends of the
empty slide rails on the rack.
b.
Push the inner rails into the slide rails on the rack until they stop at the internal stops.
c.
Slide the release clip toward the rear on both inner rails
continue pushing the appliance into the rack until its front slam latches engage with the rack posts.
Front Securing Mechanism, Inside of Front End
The rack post must be between the mounting pegs and the open securing plate.
Cisco x90 Series Content Security Appliances Installation and Maintenance Guide
Install Cisco x90 Series Content Security Appliances In a Rack
3
Securing plate shown pulled back to open
position
Figure
1-3).
(Figure 1-4
and
2
1
3
Figure
1-5), and then
1-9

Advertisement

Table of Contents
loading

Table of Contents