Planning For Installation; Preparing For Installation - IBM 106 Hardware Installation And Maintenance Manual

Ess expansion
Table of Contents

Advertisement

Planning for installation

Before beginning the enclosure installation, familiarize yourself with the system configuration
requirements.
The figures listed below show the locations for each plug-in module:
• Model 106 enclosure front panel: see Figure 3 on page 9
• Model 106 enclosure rear panel: see Figure 4 on page 10
• Model 106 enclosure top panel: see Figure 9 on page 12, Figure 10 on page 13, and Figure 11 on page
13
Important: Installation work should be performed by qualified service personnel.
Table 5. Storage system configuration
Module type
Power supply unit
System fan
I/O module
Disk drive module
Channel fan
HS Expander

Preparing for installation

CAUTION:
The weight of this part or unit is more than 55 kg (121.2 lb). It takes specially trained persons, a
lifting device, or both to safely lift this part or unit. (C011)
CAUTION: The enclosure—together will all its component parts—is too heavy to manually lift and
install into the rack cabinet. A minimum of three people and a suitable mechanical lift are required
to hoist the enclosure and install it into the rail kit assembly within the rack.
Make sure you wear an effective anti-static wrist or ankle strap and obey conventional ESD precautions
when touching modules and components. Do not touch midplane, motherboard, or module connectors.
See also ESD precautions.
This section provides important preparation requirements and handling procedures for use during
product installation.
28 IBM ESS expansion: Hardware Installation and Maintenance Guide - Model 106
Location
Rear panel
Rear panel
Rear panel
Top panel
Top panel
Top panel
Description
Two PSUs provide full power redundancy, allowing
the system to continue to operate while a faulty PSU
is replaced.
Four system fans provide cooling, allowing the system
to continue to operate while a faulty system fan is
replaced.
Up to two IOMs of the same model type are
supported. In single-IOM configurations, the IOM
must be installed in IOM slot No.0 and an IOM blank
must be installed in IOM slot No.1.
See "Populating disk drive slots" on page 13
Up to two channel fan modules of the same model
type are supported.
Eight removable hot swap expanders are supported:
one 12-drive bay.

Advertisement

Table of Contents
loading

Table of Contents