Chapter 3. Installation; Installation Planning; Prepare For Installing The Small Disk Enclosure; Power Cooling Module - IBM Small J10 Series Manual

Disk enclosure
Table of Contents

Advertisement

Chapter 3. Installation

This chapter discusses how to plan and install your IBM COS small disk enclosure into an industry
standard 19 inch rack cabinet.
CAUTION: To install the IBM COS small disk enclosure, use only the power cords supplied.

Installation planning

You must be familiar with the configuration requirements of your IBM Cloud Object Storage Small Disk
Enclosure system before you start installation. See the previous section for the correct locations of each
of the plug-in modules.
Important: Only service personnel should do installation work..
Table 7. Small disk enclosure configuration
Module type
Drive Carrier Modules
Power Cooling Modules
IOM Modules

Prepare for installing the small disk enclosure

The IBM COS Small Disk Enclosure is delivered with all drive carrier modules installed.
Warning: The enclosure together with all its component parts is too heavy for one person to easily
install into a rack cabinet.
CAUTION: Make sure that you wear an effective anti-static wrist or ankle strap and obey all
conventional ESD precautions when you touch modules and components. Do not touch midplane,
motherboard and module connectors, etc.
Before beginning the enclosure installation, familiarize yourself with the system configuration
requirements. The figures listed below show the locations for each plug-in module:
This section gives very important preparation requirements and good handling procedures. We encourage
you to use these procedures for a successful installation.
How to prepare the site and host server
Before you start, make sure that the site where you will install and use your IBM COS small storage
system has:
• A Standard AC power from an independent source or a rack power distribution unit with an UPS
(Universal Power Supply).
• IBM COS Controller node
©
Copyright IBM Corp. , 2020
Location
ALL drive bays must be populated with drives. No
bays should be empty
Two must be installed. Full power redundancy is
provided – this lets the system continue to operate
while a faulty PCM is replaced.
A maximum of two SBB I/O modules can be
installed. The unused slot must have a blank I/O
module. One IOM must be installed.
15