[8-14 Hydro Unit Maintenance Instructions ]
8-14-9
LEV Coils Replacement Procedure
Operation procedures
1) Remove the front panel (8 screws).
2) Remove the wires connecting the control
box and the LEV coil.
3) Turn the LEV coil, and pull it up to remove it.
4) Install the replacement LEV coil as shown in
the figure, and connect it to the control box
connector.
130
- chapter 8
(1)
LEV coil
(3)
Illustrations
Service panel (front)
LEV coil
BS_08_E