Setup - Toro E-Z Vac Z Master Z400 Series Operator's Manual

48in or 52in bagger, mowers
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
12
13
Note: Determine the left and right sides of the machine from the normal operating position.
Description
No parts required
Bagger bracket
Bolt (5/16 x 1 inch)
Flange nut (5/16 inch)
Bagger bracket
Bolt (5/16 x 1 inch)
Flange nut (5/16 inch)
Hood assembly
Bags
Clevis pin
Hairpin cotter
Bagger belt (from Blower and Drive Kit)
Blower assembly (from Blower and
Drive Kit)
Spring (from Blower and Drive Kit)
No parts required
Upper tube
Lower tube
Bolt (#10 x 3/4 inches)
Locknut (#10)
Washer (7/32 inch)
No parts required
Weight
Bolt (3/8 x 2 inches)
Locknut (3/8 inch)
Washer (3/8 inch)
Weight
Bolt (3/8 x 3 inches)
Locknut (3/8 inch)
Washer (3/8 inch)
No parts required
No parts required
Qty.
Prepare the machine.
1
Install the bagger bracket (Z400 Mowers
8
with 48-inch mower decks).
8
1
Install the bagger bracket (All Z400
8
Mowers with 52-inch mower decks).
8
1
2
Install the hood assembly and bags.
2
2
Route the bagger belt into the blower
1
assembly.
1
Install the blower assembly.
1
Adjust the flow baffle.
1
1
3
Install the discharge tubes.
3
3
Install the belt cover.
1
2
Install the weight for a 48-inch bagger.
2
4
2
2
Install the weights for a 52-inch bagger.
2
4
Adjust the parking brake.
Check the tire pressure.
5
Use

Advertisement

Table of Contents
loading

This manual is also suitable for:

7853178532

Table of Contents