Tools And Materials Needed - USSC Hotblast 1200Q Owner's Manual

Solid fuel warm air furnace
Table of Contents

Advertisement

You've purchased one of America's Finest Wood Burning Furnaces.
By heating with wood you're helping to CONSERVE AMERICA'S ENERGY!
Wood is our Renewable Energy Resource. Please do your part to preserve our
wood supply. Plant at least one tree each year. Future generations will thank you.
NOTE: YOUR UNIT MUST BE INSTALLED BY A QUALIFIED FURNACE
INSTALLER.
WARRANTY! NOTE: (See Page 5, First Paragraph)

TOOLS AND MATERIALS NEEDED

TOOLS
Pencil
6 Foot Folding Rule or Tape
Tin Snips
Drill, Hand or Electric
Drill Bit (For Sheet Metal Screws) 1/8" Dia.
Screw Driver (Blade-Type)
Gloves
Sabre Saw
5/16" Nut Driver or
5/16" Socket with Rachet
2
CONGRATULATIONS!
IMPROPER INSTALLATION COULD VOID YOUR
•DRAWINGS FOR ILLUSTRATION PURPOSES ONLY•
MATERIALS
6" Pipe, 6" Elbow, Collar and Thimble; as required
(24 gauge min.)
1/2" Sheet Metal Screws
6" Inside Diameter Listed Residential Type or
Building Heating Appliance Chimney or Existing
Masonry Chimney (SEE Page 8).
Electrical Wiring
6" Draft Regulator
1/2" Conduit
(Conduit Connectors)
Furnace Cement (Manufacturer Recommends:
Rutland Black - Code 78 or Equivalent
Plenum and Duct Work as Required

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents