Installation; Remove Existing Toilet; Confirm Installation Dimension - Kohler EIR Installation Manual

Intelligent
Hide thumbs Also See for EIR:
Table of Contents

Advertisement

Place an 800mmX800mm cushion on the floor, take the toilet out from the carton then place on cushion.

INSTALLATION

A. Remove Existing Toilet (If any)
Turn off the water supply. Flush the toilet, and use a sponge to remove the remaining water from the tank and bowl.
Disconnect water supply shut-off valve (if any), and remove the residual tank and bowl.
Remove old gasket from the floor and toilet flange accessory bag with a putty knife. Dismantle residual T-bolts and
discard them.
NOTICE: if a new toilet is not installed immediately, temporarily stuff a rag in flange accessory bag.
B. Confirm installation dimension
Reconfirm the product shall be able to install on buildings properly as shown below.
DANGER: Risk of electric shock. Disconnect power supply before servicing.
NOTE: This product is designed to work with wall mounted electrical and water supplies as shown in the
mounting dimensions.
WARNING: Risk of electric shock. Connect only to circuits protected by Ground-Fault Circuit-Interrupters (GFCI's)
or Earth-Leakage Circuit-Breakers (ELCB's).
Keep bath and shower head away from electrical parts (such as remote controller, receptacle etc). When the
electrical supply is mounted on the wall, an anti-splash and waterproof receptacle is required.
1366733-T01-D
Fig.#6
Flange accessory package
Fig.#7
6
Kohler Co.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents