Air Flow Guidelines For Enclosed Rack Installation; Floor Loading Considerations; Site Power Guidelines - Cisco ASR 907 Hardware Installation Manual

Hide thumbs Also See for ASR 907:
Table of Contents

Advertisement

Air Flow Guidelines for Enclosed Rack Installation

• When rack-installed equipment fails, especially equipment in an enclosed rack, try operating the equipment
• Avoid locating the Cisco ASR 907 Router in a location in which the chassis air intake vents may draw
Air Flow Guidelines for Enclosed Rack Installation
To install a Cisco ASR 907 Router in a 4-post enclosed cabinet, the front and rear doors of the cabinet must
be removed or be perforated with a minimum of 65% open area (70% for 800mm racks).
If you are mounting the chassis in a 4-post enclosed cabinet, ensure that you have a minimum of 6 inches
(15.24 cm) of clearance on each side of the chassis.

Floor Loading Considerations

Ensure that the floor under the rack supporting the Cisco ASR 907 Routers is capable of supporting the
combined weight of the rack and all the other installed equipment.
To assess the weight of a fully configured Cisco ASR 907 Router, refer to
For additional information about floor loading requirements, consult GR-63-CORE, Network Equipment
Building System (NEBS) Requirements: Physical Protection.

Site Power Guidelines

The Cisco ASR 907 Router has specific power and electrical wiring requirements. Adhering to these
requirements ensures reliable operation of the system. Follow these precautions and recommendations when
planning your site power for the Cisco ASR 907 Router:
• The redundant power option provides a second, identical power supply to ensure that power to the chassis
• In systems configured with the redundant power option, connect each of the two power supplies to a
• To prevent a loss of input power, be sure that the total maximum load on each circuit supplying the power
• Check the power at your site before installation and periodically after installation to ensure that you are
• Provide proper grounding to avoid personal injury and damage to the equipment due to lightning striking
Caution
This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation.
Install only in accordance with national and local wiring regulations.
Cisco ASR 907 Router Hardware Installation Guide
44
by itself, if possible. Power off all other equipment in the rack (and in adjacent racks) to give the router
maximum cooling air and clean power.
in the exhaust air from adjacent equipment. Consider how the air flows through the router; the airflow
direction is side to side, with ambient air drawn in from the vents located on the front right of the chassis.
continues uninterrupted if one power supply fails or input power on one line fails.
separate input power source. If you fail to do this, your system might be susceptible to total power failure
due to a fault in the external wiring or a tripped circuit breaker.
supplies is within the current ratings of the wiring and the breakers.
receiving clean power. Install a power conditioner if necessary.
power lines or due to power surges. The chassis ground must be attached to a central office or other
interior ground system.
Preparing for Installation
System
Specifications.

Advertisement

Table of Contents
loading

Table of Contents