Model Fdca601Hes - Mitsubishi Heavy Industries FDCA Series Technical Manual

Multi-type packaged air-conditioner
Table of Contents

Advertisement

Model FDCA601HES

Terminal block
190
60
60
262
Required space for maintenance and air flow
L3
L2
Air
inlet
L1
Maintenance
(
)
space
Liquid piping: ø9.52 (3/8")
(Flare connecting)
Gas piping: ø15.88 (5/8")
(Flare connecting)
46
100
55
50
15
970
Holes for anchor bolt
(M10×4 pcs.)
580
200
60
15
388
Holes for drain
(ø20×3 pcs.)
Air inlet
L4
Air outlet
Liquid piping: ø9.52 (3/8")
(Flare connecting)
Gas piping: ø15.88 (5/8")
(Flare connecting)
Opening for electric wring
Opening for electric wring
Opening for piping
and electric wring
Opening for piping
and electric wring
Opening for piping
and electric wring
40
15
Minimum allowable space to the obstacles
Installation
Mark
L1
L2
L3
L4
Notes
(1) It is prohibited to install in a space enclosed with walls
at four sides.
(2) Unit must be secured with anchor bolts.
Anchor bolt should not protrude more than 15 mm above
the surface.
(3) Where strong winds blow, the blow outlet must be
oriented at right angle against the wind direction.
(4) Secure a space of 1 m or more above the unit.
(5) Barrier standing in front of the blow outlet must be lower
than the height of unit.
37
-
-
A
Opening for piping
50
and electric wring
27
50
Opening for electric wring
VIEW A
50
1
2
type
Open
Open
300
5
150
300
5
5
Unit: mm
Unit:mm
3
500
Open
150
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents