Start-Up Checklist; Start-Up - Carrier 50ZH Series Installation, Start-Up And Service Instructions Manual

3-phase packaged heat pump
Hide thumbs Also See for 50ZH Series:
Table of Contents

Advertisement

START-UP CHECKMST
(REMOVE AND STORE IN JOB FILE)
I. PRELiMiNARY
iNFORMATiON
Model No .............................................................................................................................................................
Serial No ..............................................................................................................................................................
Date ......................................................................................................................................................................
Technician
...........................................................................................................................................................
Customer
Information(Name/Address)
...........................................................................................................................................................
II, PRE-START-UP
Verify that all packing materials have been removed from unit
Verify that condensate
connection is installed per installation
instructions
Check all electrical
connections
and terminals for tightness
Check wire proximity to refrigerant tubes and sheet metal edges
Check that indoor (indoor) air filter is clean and in place
Verify that unit installation
is level
___
Check fan wheel propeller for location in housing and setscrew tightness
ill. START-UP
Supply Voltage: L1-L2
L2-L3
L3-L1
Compressor
Amps: L1 (C)
_ L2(S)
L3(R)
Indoor Fan Amps:
Outdoor Fan Amps:
TEMPERATURE-Cooling
Mode
Outdoor Air Temperature:
DB
WB
Return-Air Temperature:
DB
WB
Cooling Supply Air:
DB
WB
PRESSURES-Cooling
Mode
Refrigerant
Suction
psig
Suction Line Temp*
Refrigerant
Discharge
psig
Discharge Tempt
TEMPERATURE-Heating
Mode
Outdoor Air Temperature:
Return-Air Temperature:
Cooling Supply Air:
PRESSURES-Heating
Mode
Refrigerant
Suction
Refrigerant
Discharge
DB
WB
DB
WB
DB
WB
psig
psig
Suction Line Temp*
Discharge Tempt
Verify Refrigerant
charge using charging tables
Verify that 3-phase scroll compressor
is rotating in correct direction.
*Measured
at suction inlet to compressor
1-Measured at liquid line leaving outdoor coil
2.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

50zh03050zh03650zh04250zh04850zh060

Table of Contents