3. Bottom of unit base elevation is flush with duct
opening in bottom of unit (see
Figure
54).
Figure 52. Field-supplied duct connection to AHU bottom supply/return air opening
Typical Trane
air handler base
Field-supplied
rigid duct
Figure 53. Field-supplied duct connection details - curb
mount for outdoor units
Unit wall
Unit base
7.25 inches
Roof curb
Building roofing and
structure may vary per job
CLCH-SVX013B-EN
Figure 53
and
Bottom supply/
return airflow
Typical Trane
air handler base
Supply opening
in floor
Unit floor
16 ga
1 in. flange
Gasket
Field-supplied
duct
Field-supplied
rigid duct
Figure 54. Field-supplied duct connection details - pier
mount for outdoor units
Unit wall
Unit base
Building roofing and
structure may vary per job

Discharge Plenum Connections

Discharge plenum sections are available with or without
openings. Sections with rectangular and round openings
have a framed opening that can be used to secure the duct
to the frames. If the duct is lined, it is important the
insulation does not obstruct the opening of the section.
For a discharge plenum with field-cut openings, attach the
duct to the side panel.
Component Installation
Supply opening
Unit floor
in floor
1 in. flange
Gasket
Field-supplied
duct
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents