Seismic Application
Requirements
Air handling equipment manufactured by Trane is capable
of structurally and operationally withstanding the seismic
response criteria as required by the International Building
Codes (IBC) 2000,2003, 2006, 2009, 2012, and CBC 2007,
2010. Trane has third-party certification for IBC compliance
for seismic applications for unit sizes 3-120 and stacked
units.
Note: If seismic isolation has been specified, the
following requirements must be adhered to for
installation. Failure to follow these instructions
would void the warranty.
CLCH-SVX013B-EN
Use for 1-inch stacked
raceway conduit
Wrap around
conduit when
attaching cover
Cover
10-16 x 0.75
stacked raceway
Step 2
Match connector
numbers (LV side)
Low-voltage (LV)
stacked harness
Step 4
Screw
self-driller
Enclosure

Single Level Design

Grade to Roof Mounted Non-Isolated
Steel dunnage/steel curb.
3/8-inch diameter ASTM A325 or SAE grade 5 bolts
attached to unit base located as noted above or 1-inch long
3/16-inch welds at unit base located as noted above.
Installation - Mechanical
Match connector
colors (HV side)
High-voltage (HV)
stacked harness
Step 5
Tie
0.25 wire
screw type
Screw
.250-14 x 0.75
self-driller
31