Barco DP K-32B Series User And Installation Manual page 34

Hide thumbs Also See for DP K-32B Series:
Table of Contents

Advertisement

Physical installation
A
2
Image 3-15: UPS connection
3.
Secure the UPS inlet socket with a fixation spring. Handle as follow:
Squeeze the fixation spring together.
Slide the fixation spring on the fixation pins while squeezing together and push it against the power plug.
Release the fixation spring.
4.
Install on the power outlet the second fixation spring to prevent losing it (2).
CAUTION: The electrical connection with the UPS INLET socket of the projector must be done with
a certified AC power supply cord (minimum 0,75 mm² or 18 AWG and minimum 300V)
CAUTION: Do not use the power OUTLET socket of the projector to provide power to other
equipment!
34
R5905754 /13
DPxK-32B
B
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp2k-32bDp4k-32b

Table of Contents