Testing An Isdn Bri Trunk; Removing The Test Setup - Avaya CS 1000 Series Installation And Commissioning Manual

Communication server, isdn basic rate interface
Hide thumbs Also See for CS 1000 Series:
Table of Contents

Advertisement

Testing ISDN BRI functions

Testing an ISDN BRI trunk

Perform procedure to test an ISDN BRI trunk DSL
1. Set up the ISDN trunk test configuration to be used, as described previously in the
2. Place a call across the ISDN BRI trunk.
3. Complete the call and hang up.

Removing the test setup

After acceptance testing is completed and the results show the system is operating correctly,
remove the ISDN BRI terminal setup and configure ISDN BRI equipment according to the
customer configuration. If the actual customer configuration was used to perform these tests,
no changes are needed.
94
ISDN Basic Rate Interface Installation and Commissioning
chapter "Set up ISDN BRI test terminals and trunks".
March 2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs 1000m sgCs 1000m mgCs 1000mCs 1000e

Table of Contents