Download Print this page

Scala 2 Side Rail; Installing Aria And Bella Side Rail - Invacare Medley Ergo User Manual

Bed
Hide thumbs Also See for Invacare Medley Ergo:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3

3.7.2 Scala 2 side rail

Mounting side rail
1.
Place the side rail over the top frame with the release
system A at the head end of the bed.
The fork links on the side rail must be mounted
according to the instruction on the side rail.
2.
Tighten the finger screws B to attach the side rail on
the top frame. Make sure it is steady and fastened.
Dismounting side rail
1. Loosen the two finger screws B and remove the side
rail.

3.7.3 Installing Aria and Bella side rail

WARNING!
Risk of entrapment / suffocation
The user can get trapped or fall out of the bed if
the side rail is not correctly mounted or damaged.
– Make sure that all gliding shoes are correctly
guided into the bed end guideways.
– Make sure that the locking screws are properly
installed at the bottom of the guideways.
The installation of Bella wooden side rail and Aria steel side
rail is identical.
Assembling the gliding system
1.
Push the pawl A from the backside, through the glider
B and make sure it locks with an audible click.
2. Do the same for all four pawls in each glider.
1556305-G
Attaching the gliding system and installing the
side rail
1. Raise the bed to 1/3 of full height.
2.
Loosen the screw at the bottom of the guides on one of
the bed ends and push the glider halfway up into the
guide until it attaches with an audible click.
3.
Push the upper side rail onto the two upper pawls.
4.
In the other end of the side rail bar; push the two upper
pawls into the end of the bar.
5.
Push the attachment into the guide until it attaches
with an audible click (=properly engaged in the lower
position).
6. Mount the lower side rail bar in both ends as in step 4.
Setup
13

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Invacare medley ergo low