Index - H3C S5830V2 Series Installation Manual

Hide thumbs Also See for S5830V2 Series:
Table of Contents

Advertisement

Index

A C E F G I L P S T V
A
Accessing the IRF fabric to verify the
configuration,29
C
Chassis
views,33
Configuration terminal
Configuring basic IRF
Connecting the console
Connecting the physical IRF
Connecting the power
E
Examining the installation
F
Fan tray
failure,31
Fan
trays,44
G
Grounding the
switch,11
I
Installation
tools,3
Installing the switch in a 19-inch
problems,31
settings,29
cable,21
ports,29
cord,18
site,1
rack,5
Installing/removing a fan
Installing/removing a power
IRF fabric setup
flowchart,24
L
LEDs,52
P
Planning IRF fabric
Ports,46
Power module
failure,31
Power
modules,43
S
Safety
recommendations,1
Setting terminal
parameters,22
Setting up the configuration
Starting the
switch,22
T
Technical
specifications,41
V
Verifying the
installation,20
56
tray,14
module,15
setup,25
environment,21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents