Installation Of The Narrow Stitching Heads 70/20 - Hohner ORION 4 Operating Instructions Manual

Wire stitching machine
Table of Contents

Advertisement

Structure and function of the machine
3.5

Installation of the narrow stitching heads 70/20

- Fig. 3.5 -
- Insert key blocks -1- into the traverses -2- .
Milled part must point downwards!
- Install the stitching head with the boring over the peg of the key blocks -1- , at the same time also
align the driving block -3- , the pusher -4- and adjusting block -5- with the corresponding rails.
- Clamp the stitching head to the machine by turning down the hex sockets -6- of the eccentric until
it is tight.
20
ORION 4
10/2010
Hohner Maschinenbau GmbH

Advertisement

Table of Contents
loading

Table of Contents