1.4

Duty and liability

The Wire Stitching Machine ORION 4 has been built according to state-of-the-art technology
under the observance of all the recognised safety regulations. It is, nevertheless, still possible when
using this machine to cause danger to life and limb of the user or a third party or to cause damage
to the machine or other property.
The machine should only be used,
for the purpose for which it was designed
when it is in a perfect technical condition
Faults that could reduce the levels of safety in using the machine must be removed immediately.
Warranties and liability on the part of the manufacturer are fundamentally covered by the
regulations laid down in our "General sales and delivery conditions".
1.5

Correct use of the machine

The Wire Stitching Machine ORION 4 is designed exclusively stitching of brochures and leaflets
or similar items. Any use of the machine contrary to that described above is forbidden since
incorrect use of the machine can present a danger.
1.6

User requirements

The user of the machine is required to provide the required personal safety equipment.
All existing safety systems should be checked regularly.
1.7

Safety and protective systems

All safety and protective systems must be attached to the machine and should be in full working
order before every start-up of the machine.
Safety and protective systems may only be removed:
when the machine is stationary and
after it has been secured against being started up again.
1.8

Informal safety measures

The Operating Manual should be stored in such a way as to be permanently to hand at the
machine. There are also generally valid local regulations concerning accident prevention and
environmental protection measures that should be made available and observed, in addition to
those described in the Operating Instructions.
All safety and danger signs on the machine should be maintained in a legible condition and should
be renewed where necessary.
1.9

Personnel training

Only skilled and trained personnel are allowed to work on the machine.
The responsibility of the various parties involved is laid out in the following table:
Transportation
Installation and commis-
sioning
Operation
Locating faults
Removing the fault
Setting up, equipping
Servicing
8
Trained persons
x
x
x
x
ORION 4
10/2010
Specialists
A haulage company
The Hohner company,
Customer Service
The Hohner company,
Customer Service
Hohner Maschinenbau GmbH

Advertisement

Table of Contents
loading

Table of Contents