IBM Power System Series Manual page 135

Temple's zeppelin procedures for install, remove, replace
Hide thumbs Also See for Power System Series:
Table of Contents

Advertisement

Figure 108: Removing the service access cover
9. Install the system-to-rail locking clips onto each rail. The system-to-rail locking clips keep the front
end of the system from dislodging from the rails when you move the system into the service position.
a) On the right side of the rail, pull the blue latch marked R (A).
SAS cables in the 9040-MR9 131

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power system e950 9040-mr9

Table of Contents