Step 7 - Commissioning - Filter Flush - Zenith Hydroboil Series Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 7 – Commissioning - Filter Flush
FILTERED
FILTER FLUSH
Rotate filter switch
to FILTER FLUSH
Fig.1
Fig.2
FILTERED
FILTER FLUSH
Rotate filter switch
to FILTERED
Fig.3
Page 8 of 24
Installation Procedures
The filter flush valve switch is located on the left side of the unit.
Check that it is in the correct position to perform a filter flush.
Rotate the filter flush switch (either way) to point down to the
"FILTER FLUSH" position, as shown in Fig.1.
Turn the mains water on and check for water leaks.
Open the dispense tap outlet (note it may have the safety lock
feature enabled). Push the red safety lock button on the right
hand side of the unit while pulling the tap lever backwards to
latch it open (see Fig.2 and next section for operating procedure).
Turn the power on (the element will not be turned on at this
stage, there is no need to have water covering the element yet).
Red safety
button
Depress or
Touch the blue "Commission" button to commence.
pull the lever
Touch "Yes" for the internal filter installation option.
It is important for the valve to be in the "Filter Flush" position to
prevent water entering the boiling tank.
Touch
[Next].
804546NZ - BW_HB Small_09.18 v1.02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydroboil 3 litre stainless steelHydroboil 5 litre stainless steelHydroboil 5 litre whiteHydroboil 3 litre whiteHydroboil 7.5 litre white303662 ... Show all

Table of Contents