Read These Warnings First; Installation Requirements - Zenith Hydroboil Series Installation And Operating Instructions Manual

Table of Contents

Advertisement

804546NZ - BW_HB Small_09.18 v1.02

Read These Warnings First

Please read all installation requirements, installation procedures and
precautions before installing any Zenith Hydroboil instant boiling water
heater.
Never attempt to install any Zenith Hydroboil instant boiling water heater
without reading all of the applicable instructions.
In some hard water areas where mineral scale accumulation in the boiling
chamber of the Zenith Hydroboil may become a problem, consideration
should be given to the maintenance required. A suitable form of water
treatment may be necessary.
The cold water supply to this appliance must be potable and fall within your
local authority's guidelines.
All plumbing connections must be made in accordance with local regulations.
The Zenith Hydroboil instant boiling water heater is not intended for use by
young children or infirm people without supervision.
Young children should be prevented from having access to ensure that they
are not able to use or play with the heater.
This appliance must be earthed. If the power supply cord is damaged it must
be replaced by a Zenith authorised agent or a qualified electrician.
Do not remove the cover of the heater under any circumstances without first
isolating the heater from the power supply.
Do not use strong, corrosive or abrasive cleaners to clean the case of the
heater.
Frost protection: If this heater is located where ambient air temperature could
fall below 5ºC when the heater is not in use, do not turn off the appliance
electrically. This safeguide does not offer the same protection to the
connecting pipework and fittings.
The ambient temperatures this unit must operate within is 5ºC - 50ºC.
This heater is intended only for indoor use and should never be installed
outdoors or be exposed to the elements of nature.
This unit must not be positioned in an area that may be cleaned by a water
jet. This unit must not be cleaned by a water jet.

Installation Requirements

Before installing, ensure that the following are available:
a) Sufficient space to position the heater so there is at least 100 mm
clearance above the heater for service access, 150 mm to its left and 20
mm to its right – the tap outlet must be positioned at least
215 mm above a draining board or drip tray.
b) Standard 220- 240 volt power cable positioned as shown on the paper
mounting template for concealed connection from the rear of the heater to
the terminal block within the heater, OR a standard 10 amp 220- 240 volt
power outlet on the wall within 1500mm of the heater. This switch must
provide all-pole disconnection and a contact separation of at least 3 mm
installed in accordance with wiring rules.
c) Cold water supply with a minimum working pressure of 150 kPa and a
maximum working pressure of 700 kPa connected via an isolation valve.
Page 3 of 24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydroboil 3 litre stainless steelHydroboil 5 litre stainless steelHydroboil 5 litre whiteHydroboil 3 litre whiteHydroboil 7.5 litre white303662 ... Show all

Table of Contents