Zenith Hydroboil Series Installation And Operating Instructions Manual page 15

Table of Contents

Advertisement

After installing a new filter, touch
flush sequence (refer to the Filter Flush diagram on page 8).
Set the valve on the side of the unit to the "Filter Flush" posi-
tion (Fig.1 on page 8) and touch
It is important for the valve to be in the "Filter Flush" position
to prevent water entering the boiling tank. Touch "Start" and
allow 5 litres of water to flow through the filter (this takes about
10min of flushing). Water must trickle out of the vent outlet (at
0.5L/min). Touch "Stop" when complete.
Touch
[Next] after flushing.
As prompted, return the filter valve to the "Filtered" position
(Fig.3 on page 8) and then touch
Touch
[Done] after flushing is completed.
804546NZ - BW_HB Small_09.18 v1.02
Menu Operation
[Flush Filter] to enter the
[Next]
[Done].
Press
[Continue] to reset the filter counter.
2.4.3 SETTINGS - FILTER LOG
From the home screen touch
This is a record of when the filter was changed.
3 INSTALL MENU
From the home screen touch
3.1 INSTALL – LIGHT CALIBRATION
This action adjusts the darkness threshold.
Light calibration is performed at normal (daylight) light level. A
suitable darkness threshold is calculated and stored for night
time low power mode (sleep mode).
From home screen touch
,
,
[Filter Log].
,
,
[Install].
,
,
, [Light Calibration].
Page 15 of 24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydroboil 3 litre stainless steelHydroboil 5 litre stainless steelHydroboil 5 litre whiteHydroboil 3 litre whiteHydroboil 7.5 litre white303662 ... Show all

Table of Contents