Daikin Altherma M ECH2O Series Installation And Maintenance Instructions Manual page 16

Table of Contents

Advertisement

4
x
Set-up and installation
● Remove packing and dispose of it in an environment-friendly
manner.
● Pull off the cover screens (fig. 4-4, item B) from the storage
tank and unscrew the threaded fittings (fig. 4-4, item F) from
the openings at which the handles are to be fitted (fig. 3-1 to
fig. 3-2, item 24).
● Screw the handles (fig. 4-4, item A) into the now uncovered
threaded holes.
A
Handle
B
Cover screen
Fig. 4-4
Installing the handles
● Install the Daikin Altherma M ECH
– Recommended clearances (fig. 4-5):
From the wall: (s1) ≥ 100 mm, (s2) ≥ 500 mm.
From the ceiling (X): ≥ 1200 mm, at least 480 mm.
– Transport the Daikin Altherma M ECH
dles.
– When setting up the unit in a cabinet, behind panels or in
other restricted conditions, sufficient ventilation (e.g.,
using ventilation gratings) must be ensured.
● If required, install the optional backup heater (EKBUxx) in the
Daikin Altherma M ECH
2
Installation and maintenance instructions
16
F
Threaded piece
O at the installation site.
2
O using the han-
2
O (fig. 4-5).
Observe the installation and operating instructions enclosed
with the accessories (
s2
X
1.
X
1200 mm
3.
2.
Fig. 4-5
Installation (shown on EKHWMX(B)500C with installation of
the optional backup heater)
tightening torque, see chap. 10.4).
< 1
0 0
0 m
m
>80°C
max. 10 Nm
4.
Daikin Altherma M ECH
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
5.
O
2

Advertisement

Table of Contents
loading

Table of Contents