Installation Guide - Navien Mate EQM 350 User Manual

Table of Contents

Advertisement

Installation Guide

To prevent heat loss when using on the floor, please put a mattress
beneath the bed warming mattress pad.
1. Put the pad cover on the pad.
If there is no cover, cover the pad with a pad or blanket on it.
If used for a long period of time without a cover or blanket, there is a risk of
low temperature burns.
2. Select the location for use.
Orient the hose-side of the pad area towards the location of the feet when
in use, and leave a space between the pad cover unit and the pad over 1
ft. (30 cm). Placing the heating unit at the same height as or slightly higher
than the pad is recommended. Do not place the heating unit on uneven
floors or on carpeted or soft floors. The heating unit will not function due
to the activation of the balance sensor.
3. Connect the hose of the pad with the heating unit
Lay the connector hose flat with the navien logo facing upwards and
firmly push the pad hose connector to the water outlet/inlet connector on
the back of the heating unit until you hear a "click".
4. Connect the power cord to the power outlet and press the power button to turn on
the heating unit.
on for the first time.
Then, as the water level indicator lamp blinks, the check lamp turns on.
5. Fill the heating unit with water.
Prepare the water.
(The amount of water to be filled is approximately 1,500ml for King size,
1,350ml for Queen size, 1,050ml for Single size.)
Open the water inlet cap by turning it counterclockwise.
Slowly fill with water while checking the level indicator lamp.
Fill with water until the high water level is displayed on the level indicator
lamp and wait for a brief period.
As the water is transferred to the pad from the heating unit, the low water level
and water shortage error will be displayed again. Fill with water as done before.
After water filling is complete, close the water cap by turning it clockwise.
The water shortage error code may occur 2~3 times during initial use. Repeat the water replenishment
procedure according to the above instructions until enough water is replenished.
We recommend using distilled water, bottled water, purified water or tap water. Using tap water may cause
partial product discoloration.
If the water touches the safety net inside the water inlet, it can overflow. Be careful to keep the water level
low enough to prevent it from touching the safety net.
For continuous and stable heating, it is recommended to fill water above the second stage (the mid level)
before or while using.
6. Set desired temperature to begin use. Refer to the "Control Panel Features" page for
instructions on setting the temperature.
12
(water shortage error code) will be displayed when turned
1ft
Click!

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comfort-mate eqm 350

Table of Contents