Potterton SIRIUS THREE FS 130 Installation, User And Service Manual page 130

Floor-standing condensing gas boiler
Table of Contents

Advertisement

11 Maintenance
Fig.187
15
Fig.188
130
15. Insert the upper panel on the low-loss header kit.
16. Ensure the upper panel is securely seated by pressing firmly on it.
16
MW-4000308-1
1. Remove the insulating shell.
1
MW-4000309-2
SIRIUS THREE FS 200 and SIRIUS THREE FS 250
7702639 - v03 - 10072018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents