Download Print this page

ParaBody Serious Steel 400102 Assembly Instructions Manual page 13

Hide thumbs Also See for Serious Steel 400102:

Advertisement

FIGURE 17
STEP 17
Securely tighten all loose frame connections made to this point.
Tighten the:
¯ REAR UPRIGHT (16) to the BASE (10).
¯ FRONT UPRIGHT (11) to the BASE (10).
¯ TOP BOOM (7) to the REAR UPRIGHT (16).
¯ and the TOP BOOM (7) to the FRONT UPRIGHT (11).
1/2
]
1/2
[
1/2
2
3
1/2
[
1/2
4
1/2
6

Advertisement

loading