Installation Instructions - Cadet SL Series Owner's Manual

Table of Contents

Advertisement

Available languages

Available languages

READ ALL
INSTRUCTIONS
AND SAFETY
INFORMATION
IMPORTANT!
It is extremely
important you verify
that the electrical
supply wires are
the same voltage
as the heater
(i.e. 120 volt heater
to 120 volt power
supply and 240 volt
heater to 240 volt
power supply).
If replacing an
existing heater,
check the labels of
the old heater and
replace using the
same voltage.
Hooking a 240 volt
heater to a 120 volt
power supply will
drastically reduce
the heater's output.
Hooking a 120 volt
heater to a 240 volt
power supply will
destroy the heater.
Connecting your
heater to an
incompatible power
supply will void
the warranty.
2

Installation Instructions

PLACEMENT: For best results install the SL heater on an inside wall. Headers and bracing are not
necessary. NOTE: The wall can must be installed in the TOP UP (horizontal) position only.
THERMOSTAT: A built-in double pole thermostat is included.
How do I install for new construction?
STEP 1
Mount The Wall Can
The SL series REQUIRES a minimum distance of
6 inches from adjacent surfaces and 6 inches
from the floor. However, Cadet RECOMMENDS
12 inches from all adjacent surfaces and 12 inches
from the floor for longer and cleaner performance.
Heaters must be spaced at least 3 feet apart.
Secure the wall can to the studs and/or sill plate
with screws through the larger (
FIGURE 2
Face of wall can
must extend
inch from face of
stud to allow for
thickness of
sheetrock.
STEP 2
Route Supply Wires
Route supply wire from circuit breaker to wall can.
Remove a knockout and attach the supply wire
with a strain relief connector, leaving 6 inches
of wire lead for later use. Connect supply ground
wire to grounding screw in wall can (See Figure 3).
Proceed to PART TWO.
GROUNDING
SCREW
Part One
How do I install in an existing wall?
STEP 1
Cut a hole 14
to wall stud. The SL series REQUIRES a minimum
distance of 6 inches from adjacent surfaces
and 6 inches from the floor. However, Cadet
RECOMMENDS 12 inches from all adjacent
surfaces and 12 inches from the floor (See Figure 4)
for longer and cleaner performance. Heaters must
/
inch) holes.
be spaced at least 3 feet apart.
3
16
FIGURE 1
FIGURE 4
STEP 2
Route supply wire from circuit breaker to wall can.
Remove a knockout and attach the supply wire
with a strain relief connector, leaving 6 inches of
1
/
or
5
/
2
8
wire lead for later use (See Figure 3).
STEP 3
Insert wall can into opening. Keeping front of wall
can flush with wall, secure to wall stud with screws
through the four larger (
STEP 4
Connect supply ground wire to grounding screw
in wall can (See Figure 3). Proceed to PART TWO.
FIGURE 3
SUPPLY WIRE
KNOCK-OUT
(TWIST TO
REMOVE)
STRAIN RELIEF
CONNECTOR
Cut Hole in Wall
1
/
inches wide by 10 inches high next
8
Route Supply Wires
Mount The Wall Can
3
/
inch) holes.
16
Connect Ground Wire

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl152twSl252twSl302twSl101twSl151twSl192tw

Table of Contents