Fitting the thermal insulation and casing...
Top and bottom rails and side panel supports
Parts required from thermal insulation pack 2:
■
Top left rail
wT
■
Top right rail
wZ
16x
1.
A
4.
16x
5.
Fig. 12
5. Loosely fit the supports to the base frame, using
two M 6 x 16 screws for each.
Side panels
Parts required from thermal insulation pack 1:
■
Centre side panel
5
■
Back right side panel
■
Back left side panel
2
■
Side panel
6
16
2.
wT
3.
eW
4
(cont.)
Bottom rails
■
eP
Screws from bag of fixing parts
■
■
Connectors
eW
wZ
eP
Note
The top rails must be flush at the front (see
The base rails must protrude at the back.
Parts required from thermal insulation pack 2:
■
Centre side panel
■
Control unit side panel
■
Screws from bag of fixing parts
eQ
are supplied with the boiler
5
qI
eQ
).
A