Genie Lift Guard GR-12 Operator's Manual Supplement page 15

Contact alarm
Hide thumbs Also See for Lift Guard GR-12:
Table of Contents

Advertisement

First Edition • First Printing
Installation Instructions
GRC-12:
1
Turn the key switch to the off position and push
in the red Emergency Stop button to the off
position at both the ground and platform
controls.
2
Open the ground control compartment.
3
Cut and discard any cable ties securing the
harnesses from the ground controls.
4
Disconnect the gray J1 connector from the
back of the ground controls.
1 J1 connector
5
Disconnect the opposite end of the harness
from the 6 pin C4 connector.
Note: The C4 connector is located at the bottom of
the ground control compartment.
6
Remove the receptacle locks from both
connectors and set aside.
7
Remove the white plugs from connector J1 pin
11 and C4 pin 6 and discard.
8
Install the jumper wire assembly into J1 pin
11 and C4 pin 6. Genie part number
1294071GT.
9
Install the receptacle locks set aside.
10 Secure the wire assembly inside the wire loom.
Part No. 1293402GT
11 Connect both connector to the machine..
12 Secure the harnesses in the ground controls
13 Remove the cover from the junction box and
1
14 Remove the AC power outlet and set aside. (if
15 Disconnect the platform controls harness from
16 Remove the platform controls harness from the
Note: Do not remove the harness from the platform
at this time.
17 Cut and discard the terminal from the white
Lift Guard™ Contact Alarm
Operator's Manual Supplement
Installation Instructions
compartment using cable ties. Genie part
number 28443GT.
set aside.
1
2
1 junction box
2 cover
equipped)
the mast harness inside the junction box.
junction box and set aside.
wire inside the junction box.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lift guard gr-15Lift guard gr-20Lift guard grc-12

Table of Contents