Led Fpc; Figure 4-29 Removing The Led Fpc - Toshiba PORTEGE R200 Replacement Procedures

Hide thumbs Also See for PORTEGE R200:
Table of Contents

Advertisement

4 Replacement Procedures

4.22 LED FPC

Removing the LED FPC
To remove the LED FPC, follow the steps below and refer to Figure 4-29.
1. Remove the following screws and LED FPC.
• M2×3C
LED FPC
Installing the LED FPC
To install the LED FPC, follow the steps below and refer to Figure 4-29.
1. Install the LED FPC according to the guide and secure it with the following screws.
4-42
[CONFIDENTIAL]
S-FLAT HEAD screw
M2×3C S-FLAT HEAD

Figure 4-29 Removing the LED FPC

M2×3C
S-FLAT HEAD screw
x2
x2
PORTEGE R200 Maintenance Manual (960-519)
4.22 LED FPC

Advertisement

Table of Contents
loading

Table of Contents