Table Of Contents - Daikin Altherma 3 H HT ECH2O Series Installation Manual

Heat pump (indoor unit) with integrated heat accumulator
Hide thumbs Also See for Altherma 3 H HT ECH2O Series:
Table of Contents

Advertisement

List of contents
List of contents
1.1
Particular safety instructions .....................................................
1.1.1
Observing the instructions ..........................................
1.1.2
Meaning of warnings and symbols..............................
1.2
1.2.1
General .......................................................................
1.2.2
Intended use ...............................................................
1.2.3
Device installation room..............................................
1.2.4
Electrical installation ...................................................
1.2.5
1.2.6
1.2.7
Operation ....................................................................
1.3
1.4
Warranty conditions...................................................................
2.1
Design and components............................................................
2.2
Function of the 3-way switch valves.......................................... 10
3.1
Dimensions and connection dimensions ................................... 11
3.2
Transport and delivery............................................................... 12
3.3
Installing the heat pump ............................................................ 12
3.3.1
Selecting the installation site....................................... 12
3.3.2
Installing the device .................................................... 13
3.4
Preparing the device for installation .......................................... 14
3.4.1
Remove the front screen............................................. 14
3.4.2
Remove the protective cover ...................................... 14
3.4.3
3.4.4
Open the controller housing........................................ 15
3.4.5
3.4.6
Opening the vent valve ............................................... 16
3.4.7
return flow ................................................................... 16
3.4.8
Making the hood opening............................................ 17
3.4.9
3.4.10
Securing the hood....................................................... 17
3.5
Installing optional accessories................................................... 18
3.5.1
3.5.2
set ............................................................................... 18
3.5.3
Installation of the DB connection kit............................ 18
3.5.4
Installation of the P connection kit .............................. 18
3.6
Water connection ...................................................................... 19
3.6.1
Connecting hydraulic lines .......................................... 19
3.7
Electrical connection ................................................................. 20
3.7.1
Overall connection diagram ........................................ 22
3.7.2
strips ........................................................................... 23
3.7.3
Mains connection ........................................................ 23
3.7.4
3.7.5
Connecting the heat pump outdoor unit...................... 23
3.7.6
(optional) ..................................................................... 24
3.7.7
External switching contact .......................................... 24
3.7.8
EBA (external requirement request) ........................... 24
3.7.9
Connecting an external heat generator....................... 25
3.7.10
Connecting the room thermostat................................. 26
3.7.11
3.7.12
Connecting the HP convector ..................................... 26
3.7.13
3.7.14
Off-peak mains connection (HT/NT) ........................... 27
3.7.15
3.8
Filling the system....................................................................... 28
3.8.1
pressure gauge ........................................................... 28
Installation manual
2
3.8.2
Filling hot water heat exchangers ................................ 28
3.8.3
Filling the storage tank................................................. 28
3.8.4
Filling the heating system ............................................ 29
3
3
5.1
Requirements ............................................................................. 32
3
5.2
Commissioning at low ambient temperatures ............................ 32
4
5.3
Bleeding the hydraulic system.................................................... 32
4
5.4
Checking the minimum flow ....................................................... 33
4
5.5
Start screed drying (only if required) .......................................... 33
5
5.6
Commissioning checklist ............................................................ 34
5
5.7
Handover to the operating company .......................................... 34
6
6
6
6.1
Information on the type plate...................................................... 35
6
6.2
Tightening torque ....................................................................... 35
6
6.3
Electrical connection diagram .................................................... 36
7
6.4
Piping diagram for refrigerant circuit .......................................... 38
8
7 Notes
8
11
Heat pump (indoor unit) with integrated heat accumulator
31
32
35
39
Daikin Altherma ETS(X/H)(B)-D
008.1448499_00 - 06/2019 - EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents