Replacing An Sfp Transceiver - IBM Storwize V7000 Unified Problem Determination Manual

Table of Contents

Advertisement

Handles for the upper and lower expansion canisters overlap each other. The
handle with the finger grip on the left removes the upper canister ( 1 ). The
handle with the finger grip on the right removes the lower canister ( 2 ).
Figure 39. Rear of expansion canisters that shows the handles.
5. Squeeze them together to release the handle.
Figure 40. Removing the canister from the enclosure
6. Pull out the handle to its full extension.
7. Grasp canister and pull it out.
8. Insert the new canister into the slot with the handle pointing towards the
center of the slot. Insert the unit in the same orientation as the one that you
removed.
9. Push the canister back into the slot until the handle starts to move.
10. Finish inserting the canister by closing the handle until the locking catch clicks
into place. Make sure that the canister is firmly and correctly seated,
otherwise this can lead to problems.
11. Reattach the SAS cables.

Replacing an SFP transceiver

When a failure occurs on a single link, the SFP transceiver might need to be
replaced.
1
2
Chapter 5. Control enclosure
213

Advertisement

Table of Contents
loading

Table of Contents