Procedure
Figure 5-3
1. Grease the bearing surfaces of the load cell with a bearing lubricant.
2. Insert load cell with the pressure pieces.
3. Lower the load bearing implement onto the load cells.
5.2.6

Checking the installation

CAUTION
Destruction of the load cell and the pressure piece set
Check that the load cell and the pressure piece set are installed correctly, e.g. by checking
the mounting dimensions and oscillation distances. Incorrect assembly can lead to the
destruction of the load cell and the pressure piece set.
1. Check the installation of the load cell:
5.3

Installing the grounding cable

1. Prepare a permanently contacting bolted connection such as M10 on the load bearing
2. Screw the grounding cable tight.
CP-S SB
Operating Instructions, 11/2010, A5E03323543B
Inserting the load cell
– The load bearing implement must be able to oscillate freely.
– The load cell should be aligned as vertically as possible.
implement and foundation for securing the grounding cable.
Installation
5.3 Installing the grounding cable